| Device: | 
          A Whale.  | 
        
        
          | Type: | 
          Supply U-boat, construction type XIV, 1600 tons.  | 
        
        
          | Built: | 
          Deutsche Werke, Kiel.  | 
        
        
          | Flotilla: | 
          12th at Bordeaux.  | 
        
        
          | Crew: | 
          7 officers (including a doctor) and about 50 men.  | 
        
        
          | Motors: | 
          2 Seimens.  | 
        
        
          | Diesels: | 
          2 Germania Werft.  | 
        
        
          | Radio: | 
          Believed to have been fitted with the usual equipment.  | 
        
        
          | Call Letters:  | 
          Ulli Viktor Gustaf.  | 
        
        
          | Search Receiver:  | 
          New type with fixed aerial fitted.  | 
        
        
          | Radar: | 
          Probably not fitted.  | 
        
        
          | K.D.B.: | 
          Not fitted. | 
        
        
          | Submarine Bubble Target: | 
          Not fitted.  | 
        
        
          | Armament: | 
          No torpedo tubes.  | 
        
        
          |   | 
          No torpedoes carried on her last patrol.  | 
        
        
          |   | 
          One 2 cm forward.  | 
        
        
          |   | 
          one 2cm. on bandstand.  | 
        
        
          |   | 
          one 2 cm. abaft conning tower, mounted on a platform about 3 feet high, connected with the bandstand by a cat-walk.  Platform called "Atlantik Walle" by crew.  | 
        
        
          | Surface speed:  | 
          About 15 knots.  | 
        
        
          | Submerged speed:  | 
          About 6 knots.  | 
        
        
          |   | 
            | 
        
        
          | Launched: | 
          17 September 1942.  | 
        
        
          | Commissioned: | 
          21 December 1942.  | 
        
        
          | Working up:  | 
          Early January - late February, 1943, in Baltic Sea.  | 
        
        
          | Final overhaul:  | 
          Late February - late March, Deutsche Werke, Kiel.  | 
        
        
          |   | 
            | 
        
        
          | 1st War Patrol:  | 
          Left Kiel 27 March 1943.  | 
        
        
          |   | 
          Arrived Kristiansand 28 March 1943.  | 
        
        
          |   | 
          Left Kristiansand 29 March 1943.  | 
        
        
          |   | 
          Proceeded to operational area in North Atlantic, passing between Iceland and the Faeroes.  | 
        
        
          |   | 
          Refueled about 15 U-boats, including U-Vowe, U-Stahl, U-Müller, and U-Bülow, the latter as he was en route to port, several days after he claimed to have sunk the aircraft carrier U.S.S. RANGER.  | 
        
        
          |   | 
          Put into Bordeaux mid-May, after about 6 weeks patrol.   | 
        
        
          |   | 
          Gun platform ("Atlantik Walle") abaft the bandstand built in Bordeaux.  |